On Tue, Apr 02, 2002 at 01:21:24PM +0100, Noll, Kevin wrote:
Hi All
We are standardized with Sun and Cisco equipment. All equipment on our Database Vlans are using Gig Ethernet. Flow control on our sun servers are set to on. However, on our Cisco Switches, the settings are as follows.
set port flowcontrol 2/1-12 send desired
set port flowcontrol 2/1-12 receive off
I am not a cisco engineer, but would like to know if this is correct. I believe it should be both on.
This is the configuration that was necessary on our site (and the same with IOS-based switches). It was also recommended by our local NetApp people.
I guess this makes it as 'correct' as possible.
Greetings,